How does it work
For the assembly and installation of our temporary shower, you must take the following points of attention into account. The installation is fully taken care of by our installer.
Douchesimpel, a unique demountable design.
B x L x H (1 x 1,2 x 2,25 m)
Due to the unique demountable design of our cabin, your temporary shower cabin can be installed at any desired location. All you need to do is be sure you make a reservation and we’ll take care of the rest.
Space required
W x L x H (1 x 1,2 x 2,25 m)
The space indicated above is required for assembly. The distance to the drain (+/- 5 meters) determines where the cubicle can be installed.
Suitable locations include the garage, garden, kitchen, bedroom or attic.
As the shower is supplied disassembled, a restricted access route is no problem whatsoever.
Water supply
(+/- 10 m)
The supply hose is connected to a tap within a radius of 10 m. The hose is attached using a connector included with the supplied accessories. This allows it to be detached when the shower is not in use, so you can continue using the tap.
Cold water tap ( boiler filling valve/ washing machine tap )
If the supply hose is connected to a cold water tap, the water is heated by the water heater supplied by us. This electrically powered heater allows you to shower for as long as you like without the need to wait for the water to warm up.
Mixer tap, thermostatic tap
If the supply hose is connected to a mixer tap, thermostatic tap, no water heater is required.
Water drain
(+/- 5 m)
The drain hose is connected to a drain within a radius of 5 m.
A sink, rainwater drain or washing machine drain can be used.
The supplied drain pump means that a higher drain is no problem whatsoever. Our drain hose has a diameter of 32 mm.
Water heater consumption
(16 Amps 3,5 kWh)
If the shower is connected to a cold water tap, a water heater heats the water.This is equipped with 2 power cables, both of which must be connected to an earthed socket. Due to the required capacity (2 x 16 Ampere, 3.5 kW), 2 power groups must be available. One unloaded (free) power group with earthing and in addition a second grounded power group that may be loaded.